
Fort Worth, Texas
Kitchen Remodeling in Fort Worth, Designed and Built by One Team
We are a Fort Worth design-build firm. Your kitchen is drawn, priced, and built by the same team — so the plan you approve is the plan that gets built.
Request a Consultation
Start with a conversation at your home.
We look at the kitchen, talk through what is not working and what you want to change, and explain what the work would involve — before anyone commits to anything.
- One team, start to finish
- The people who draw your kitchen are the people who price it and build it.
- Design led by a certified remodeling designer
- Jennifer Valdes, CRD — NARI Certified Remodeling Designer. Meet the team
- Based in Fort Worth
- Working across the Dallas–Fort Worth Metroplex. See our service areas
This page is for you if
- You are remodeling a kitchen in Fort Worth or the surrounding Metroplex.
- You want one team accountable for the design and the construction, not a designer handing drawings to a builder.
- You would rather resolve layout, cabinetry, and appliance decisions on paper than during demolition.
- You want a real number before work starts, not an allowance that moves.
- The kitchen opens into other rooms, and you want the whole sequence to read as one design.
A kitchen is the most technically demanding room in a house. It carries plumbing, gas, ventilation, dedicated circuits, and appliances with real clearance requirements — all inside a layout that has to work for the way a specific family moves through it. We design the room and build it, which means those constraints get resolved on paper before they become field decisions.
What’s Included
- Layout and space planning
- Cabinetry design, specification, and installation
- Countertop and backsplash selection and templating
- Appliance planning, clearances, and integration
- Lighting design — ambient, task, and decorative
- Plumbing and electrical coordination
- Ventilation and make-up air
- Flooring and transitions
What actually matters on this work
- Layout before finishes
- Cabinet doors, drawer fronts, and stone get chosen late. Where the sink, range, refrigerator, and circulation go gets decided first, because everything else depends on it.
- Storage that matches the household
- Interior fittings — drawer configurations, pantry depth, appliance garages — are planned around what actually gets stored, not a standard cabinet catalog.
- Systems you won't see
- Ventilation sizing, dedicated circuits, and water supply are unglamorous and are the things that make a kitchen work for twenty years.
Why design-build changes a kitchen project
A kitchen carries plumbing, gas, ventilation, dedicated circuits, and appliances with real clearance requirements, all inside a layout that has to suit one specific household. When a designer draws it and a separate contractor prices it afterwards, the negotiation that follows is a redesign under time pressure — and the homeowner pays for it twice.
We price as we draw. Cabinetry, stone, plumbing locations, lighting, and appliances are resolved together during design, because each one depends on the others. That is what makes a fixed scope possible before demolition, and it is why change orders on our projects come from genuine surprises behind the drywall rather than from decisions that were simply left open.
Design and preconstruction are led by Jennifer Valdes, CRD, a NARI Certified Remodeling Designer. The drawings are tested against real cost and real site conditions as they develop, by the people who will build from them.
How It Works
From first conversation to construction-ready.
- 01
Consultation
Understand the home, project goals, priorities, and desired outcome.
- 02
Design & Planning
Develop the layout, project direction, scope, selections, and visual concepts.
- 03
Preconstruction
Finalize scope, estimate, trade coordination, scheduling, materials, and construction planning.
- 04
Construction
PHR manages the construction process, trades, schedule, communication, and quality control.
- 05
Completion
Final walkthrough, project closeout, and turnover.
You’ll know the scope, the selections, and the number before construction starts.
Request a Kitchen ConsultationKitchen Work We Take On
From a single room to the whole floor plan.
Design and preconstruction led by Jennifer Valdes, CRD — NARI Certified Remodeling Designer. Meet the team
Related work
All projects- Do you remodel kitchens in Fort Worth?
- Yes. Fort Worth is our home city — our office is on Crockett Street — and we work throughout the Dallas–Fort Worth Metroplex, including Southlake, Colleyville, Westlake, and Keller.
- What does a kitchen remodel with PHR include?
- Layout and space planning, cabinetry design and installation, countertops and backsplash, appliance planning and clearances, lighting design, plumbing and electrical coordination, ventilation and make-up air, and flooring with its transitions. Design and construction are handled by the same team.
- How does a kitchen project start?
- With a consultation at your home. We look at the existing kitchen, talk through what is not working and what you want to change, and explain what the work would involve before anyone commits to anything.
- Can you open the kitchen into the living area?
- Often, yes — but whether a wall can come out depends on what it is carrying. That is a question we answer during design rather than during demolition, which is the point of resolving structure before the scope and the price are fixed.
- How long does a kitchen remodel take?
- It depends on the scope, the selections, and what the existing conditions turn out to allow, so we do not quote a standard duration. You will have a schedule as part of preconstruction, before construction begins, alongside the scope and the estimate.
- What will it cost?
- We do not publish kitchen pricing, because a number quoted without seeing the room is a guess. The consultation and preconstruction process is what produces a real estimate tied to your actual selections and your actual house.
Not Ready to Start a Project?
Book a 30- or 60-minute consult with a certified remodeling designer.
By video or in person. Your full consult fee is credited toward a Design + Preconstruction agreement signed within 90 days.
Other Services
Bathroom Remodeling
Thoughtfully designed primary and secondary bathrooms — layout, cabinetry, tile, plumbing fixtures, lighting, storage, and finishes.
Whole-Home Renovations
Comprehensive renovations coordinating layout changes, finishes, cabinetry, systems, and construction throughout the home.
Additions & Structural Remodeling
Room additions, expanded living spaces, layout modifications, and substantial residential transformations.
Design + Preconstruction
Planning, layouts, selections, visualization, estimating, scope development, and construction preparation.
Start Your Project
Tell us about your home.
Share a few details about the space and what you'd like to change. We'll follow up to schedule a consultation and walk the project with you.

